How to Read a Roofing Quote in San Francisco | Line by Line & Questions to Ask

Quick Answer: Start With the Scope, Not the Price
Compare the scope first and the totals last. A quote that is thousands cheaper is almost never a bargain — it is a different job. One bid is a layover with reused flashing and standard felt. Another is a full tear-off with synthetic underlayment, new flashing, and added ridge venting. Those are not two prices for the same roof. They are two different roofs. Line the scopes up side by side, rewrite the cheaper quote to match the fuller one, and the numbers get a lot closer. If a bid is still far below the others after you have matched the scope, ask what was left out, who is doing the work, and whether the company carries insurance. Somebody is absorbing that difference, and it is usually you, three years later.
Key Facts
- A roofing quote should describe the job in enough detail that a different crew could build it from the paper alone. If it cannot, it is not a quote — it is a guess with a number on it.
- A square is 100 square feet. The average American house is 20–30 squares. Compare the square counts first, not the prices.
- Waste factor is real: about 10% on a simple roof, about 15% on a cut-up roof with hips and valleys. A high waste factor on a plain gable is padding, not waste.
- Decking is the most abused line on a roofing estimate in America. Nobody can see it until the shingles come off, so get a per-sheet price and a not-to-exceed number in writing before work starts.
- In California, the deposit on a home improvement contract is capped at 10% or $1,000, whichever is less (Business & Professions Code §7159). You also have a 3-day right to cancel, and any contract over $500 must be in writing.
- There are two separate warranties: the manufacturer’s warranty on the materials, and the contractor’s workmanship warranty on the installation. A verbal promise is not a warranty.
- Most San Francisco roofs are flat or low-slope — torch-down, TPO, or silicone — not pitched shingles. A quote written for a pitched shingle roof does not describe your roof.
- Fog, salt air, and the November-to-March rain season are the three things that kill a San Francisco roof. A quote that ignores them is written for somewhere else.
Estimate vs Quote vs Proposal vs Contract — What You Are Actually Holding
Homeowners use these four words like they mean the same thing. They do not, and confusing them is how people sign an estimate thinking it is a contract. Here is the difference, settled:
| Document | What it is | Can the price change? |
| Estimate | An educated guess at the price, based on what the roofer can see | Yes — it is a forecast, not a promise |
| Quote | A firm rate for a defined scope, usually with an expiration date | Only by written change order |
| Proposal | A documented scope of work with a price attached | Only by written change order |
| Contract | The signed agreement — scope, price, payment, warranty, all in writing | Only by written change order |
An estimate is the forecast. A quote is the ticket. A proposal is the scope in writing with a price on it. A contract is what you sign. If a roofer hands you a one-line estimate that says “replace roof and all accessories” plus a price, that is the weakest document in the trade — ask for the full proposal before you compare anything. And if a roofer will not put the scope in writing, that is your answer. Do not hire them.
The 12 Lines Every Roofing Quote Must Have
Print this and hold it against every quote. Anything absent is a question, not necessarily a problem — but it is a question you must ask before you sign.
| # | Line item | What good looks like | What missing means |
| 1 | Legal name and physical address | Full company name, real address, phone | A P.O. box only is a warning sign |
| 2 | License number | C-39 license number, printed on the document | Look it up at cslb.ca.gov before you sign |
| 3 | Liability and workers’ comp | Proof of coverage, not a verbal promise | An uninsured injury on your roof can reach your policy |
| 4 | Tear-off scope and layer count | How many layers come off, disposal included | A re-cover priced as a tear-off, or the reverse |
| 5 | Decking price per sheet | Per-sheet price agreed in writing, before work | An open-ended change order on day two |
| 6 | Underlayment and ice & water shield | Type named, coverage named (valleys, eaves, penetrations) | “Felt” with no type or coverage is not a specification |
| 7 | Flashing — new or reused | The word “new” at chimney, walls, valleys, pipes | Reused flashing is the commonest leak in three years |
| 8 | Roof covering, named | Manufacturer, product line, color | “Architectural shingles” alone is not a specification |
| 9 | Ventilation | Ridge vent plus intake plan, in writing | A ridge vent with blocked intake does nothing |
| 10 | Property protection and cleanup | Tarps, magnet sweep, dump fees, AC and landscaping | Either free, or coming later as a surprise |
| 11 | Permits, named separately | Who pulls the SF permit, who schedules final inspection | A permit hidden inside “miscellaneous” is not a permit |
| 12 | Warranty terms, in writing | Manufacturer and workmanship, separately, in years | A verbal promise is not a warranty |
Two of those lines deserve emphasis, because they are where San Francisco quotes go wrong most often. Line 4: on a flat roof in the Sunset or the Richmond, the question is not just tear-off vs layover — it is whether the old torch-down comes off to the deck, whether ponding areas get re-sloped, and whether the drains and parapet flashing are in the scope. Line 7: chimney flashing on a Victorian in the Mission or the Castro is the hardest water-intrusion point on the house. Done right, it means cutting into the mortar joints and setting the metal into the brick. Done wrong, it is a bead of caulk that fails in three summers.
Reading a Sample Quote, Line by Line
Nobody shows you a real quote. Here is what one looks like when you read it properly — no prices, because the words are the point, not the numbers. Each line is marked good, vague, or missing.
Line 1 — Squares: 26. Good. A square is 100 square feet, so 26 squares is 2,600 square feet of roof. Now check it against the other two quotes. If one says 26 and another says 32, somebody is wrong — your roof is one size, and it does not change based on who measured it. A square or two apart is normal. Six apart is a decision. Ask how they measured: satellite report, drone, or a tape on the roof. Any of the three is fine, but the roofer should be able to tell you which one and hand you the report. And check the layer count yourself before anybody starts: look at the thickness of the layers at the rake edge, the slanted edge at the end of the house. One layer is one thickness. Two is visibly double. Photograph it with your phone.
Line 2 — Waste factor: 15%. Good on a cut-up roof, padding on a plain gable. Waste is real — shingles get cut at hips, valleys, and penetrations, and the cut pieces go in the dumpster. But 22% on a plain two-slope gable with nothing in the way is not waste. That is margin wearing a costume. And ask the question almost nobody asks: what happens to the leftover material? On most jobs there are unopened bundles at the end. Does it stay with you, or go back on the truck? There is no wrong answer. The question tells the roofer you are reading.
Line 3 — Tear-off: 1 layer. Vague. One layer of what, and is disposal included? Tear-off is priced per square, labor plus dump fees. If your house has two layers, that is twice the tear-off labor and twice the dumpster, and it should be priced higher. If somebody writes two layers on a house that has one, you will never know — by the time anyone could check, it is in a dumpster and gone. That is why you photograph the rake edge first.
Line 4 — Decking: “as needed.” Missing. This is the single most abused line on a roofing estimate in America, and “as needed” with no per-sheet price is an open door. On day two you get the phone call: the roof is stripped, there is more rot than anybody expected, and it is going to be another 22 sheets. You are in the worst negotiating position of your life — your house is open to the sky, weather is coming Thursday, and you are not getting a second opinion. Close that door before anybody starts. The fix is in the change-order section below.
Line 5 — Flashing: “reuse existing.” Vague, and usually wrong. The word you want to see is “new.” Reusing flashing saves a couple hundred dollars today and is the reason you call someone back in three years. If the estimate says reuse, ask why, and get the answer in writing.
Line 6 — Ventilation: ridge vent. Vague. What is happening with the intake at the eaves? If nobody has been in the attic to look at the soffit intake, the new ridge vent will not do a thing — on a lot of houses the intake is blocked. A ridge vent with no intake plan is not a ventilation plan.
Line 7 — Labor: one lump number. Vague. There is nothing wrong with a contractor making money — payroll, insurance, workers’ comp, a truck, a warehouse, liability. It should be in the price. But a single lump labor number makes the whole estimate impossible to compare, because when one bid says one number and another says a different number and most of the money sits in one line called “labor,” you are not comparing two roofs. You are comparing two paragraphs. Ask for it broken out: tear-off labor, install labor, decking labor if it comes up. A good company does this routinely. If somebody will not break it out, that is the answer to the question.
Line 8 — Miscellaneous: a four-figure number, no description. Missing. Every job has nails, caulk, starter strip, boot collars, and dumpster fees. That is real. But you are entitled to know what is in it. Four-figure miscellaneous lines on mid-size jobs have turned out to be considerably smaller once somebody finally asked for them itemized. Just ask what is in this line. That is the whole technique.
The 7 Checks That Take 15 Minutes
Do these with three bids on the kitchen table, a pen, and 15 minutes. They are the fastest way to make three different quotes comparable.
- Compare the square counts first, not the prices. 26 vs 32 squares is six squares of material and labor you may be paying for.
- Check the waste factor against how complicated your roof actually is. 10% simple, 15% cut-up, 22% on a plain gable is padding.
- Verify the layer count yourself from the ground. Photograph the rake edge before anybody starts.
- Get a per-sheet decking price and a not-to-exceed number in writing. “If it goes past 10 sheets, you call me before you replace another one.”
- Look for the word “new” on the flashing. Chimney, walls, valleys, pipes, drip edge — new, not reused.
- Get labor broken out. Tear-off, install, decking — not one lump number.
- Ask what is in “miscellaneous.” Then ask what is in “allowance,” too — an allowance is a placeholder amount for work that cannot be confirmed yet, and it is where the final price grows.
What usually happens when you do this: the prices come closer together. A lot of the spread between three bids is not three different qualities of roof. It is three different amounts of padding. And padding does not survive being asked about politely.
San Francisco Flat-Roof Line Items: What Your Quote Must Say
Here is where every national guide fails you, and where this one earns its keep. The competitors all walk a pitched shingle quote. Most San Francisco houses do not have a pitched shingle roof. Walk the Sunset (94122) or the Richmond (94121, 94118) and look up: row after row of flat and low-slope roofs. Same in SoMa (94103), the Mission (94110), and the Castro (94114). A quote written for shingles does not describe your roof, and a roofer who hands you one has not looked at your house.
What a flat-roof quote must list:
- The system, named: torch-down modified bitumen, TPO single-ply, or silicone coating. Not “flat roof material.” The product name, the manufacturer, and the thickness or mils.
- Preparation: what comes off, what gets cleaned, what gets primed. A silicone coating over a dirty, unprimed roof is a coating that peels. If prep is not in the quote, it is not in the job.
- Ponding: where water stands after rain, and what the quote does about it. Ponding is the flat roof’s version of a leak — it is not a puddle, it is a slow failure. Ask whether the quote includes re-sloping, tapered insulation, or additional drains.
- Parapet flashing and drains: the two places flat roofs actually leak. Parapet flashing should be new, and drains should be named — how many, what size, whether scuppers are included.
- Title 24: California’s cool-roof rule applies to flat and low-slope roofs. The quote should say how the proposed system meets it. If it does not mention Title 24 at all, ask.
The San Francisco environment, in the quote:
- Marine-layer fog rolls in off Ocean Beach most mornings and sits on the roof until midday. A roof in the Sunset stays wet longer than a roof in the Mission, and moisture is what rots decking. Fog is not a view — it is a maintenance condition.
- Salt air near the coast corrodes metal flashing and fasteners faster than inland. If your house is west of 19th Avenue, ask whether the quote specifies corrosion-resistant flashing and fasteners.
- The November-to-March rain season is when flat-roof problems show up. A quote written in October that schedules tear-off in January without a weather plan is a quote that has not thought about rain. Ask what happens if it rains mid-job: tarps, staging, and who pays for the delay.
- Wind at Twin Peaks and Bernal Heights, and on the hilltops generally, lifts loose flashing and drives rain sideways into wall joints. Wall flashing matters more on a hilltop house than on a flat-block house, and the quote should say so.
For the flat-roof systems themselves — when restoration beats replacement, and what a coating quote should actually list — see the commercial roof restoration vs replacement guide. For what happens when a flat roof leaks in rain, see the flat roof repair in wet weather guide.
California Rules on Your Quote
This is the section no competitor has, because no competitor writes for California. Every California roofer must hold a Contractors State License Board license, and every quote and contract should show the number. Look it up at cslb.ca.gov before you sign anything: it shows whether the license is active, whether the bond is in place, and whether the company has workers’ compensation coverage for its crew.
The three California rules that matter most on a quote:
- Deposit cap: on a home improvement contract, the deposit is capped at 10% of the contract price or $1,000, whichever is less (Business & Professions Code §7159). A roofer asking for half the job up front is asking you to finance them. Two other sources in the research give different numbers — one Ontario guide says 10–30%, one American guide says 10–15%. Both are wrong for California. The cap is 10% or $1,000.
- 3-day right to cancel: you have three business days to cancel a home improvement contract after signing. The contract must tell you that in writing.
- $500 written-contract rule: any home improvement job over $500 must be in a written contract. A handshake and a verbal price are not a contract, and a verbal quote that keeps rising — a pattern in the research, including one thread where the price went up every time the contractor called — is a red flag, not a negotiation.
The San Francisco permit: a roof replacement in San Francisco needs a permit from the Department of Building Inspection (DBI). The quote should name who pulls it and who schedules the final inspection. If the permit is hidden inside “miscellaneous,” it is not a permit — it is a hope. And the final inspection is not a formality: it is the city’s check that the work matches the permit, and it happens before your final payment, not after.
The 3-Quote Comparison Worksheet
Do not compare totals. Compare lines. Put the three quotes side by side and mark each line item as included, allowance, excluded, or missing. Here is the worksheet — copy it, print it, and fill it in with a pen.
| Line item | Quote A | Quote B | Quote C |
| Squares (roof size) | |||
| Waste factor | |||
| Tear-off layers | |||
| Decking per-sheet price | |||
| Decking sheets included | |||
| Underlayment type | |||
| Ice & water shield coverage | |||
| Flashing — new or reused | |||
| Shingle / system brand + line | |||
| Ventilation (ridge + intake) | |||
| Skylights / solar / gutters | |||
| Permits | |||
| Cleanup + magnet sweep | |||
| Manufacturer warranty | |||
| Workmanship warranty | |||
| Deposit and payment schedule | |||
| Quote valid until |
The normalizing rules — how to make three different quotes comparable:
- Same squares. If one quote says 26 squares and another says 32, fix the measurement first.
- Same waste factor. A 22% waste factor on a simple roof is not a measurement difference.
- Same layers. One layer vs two layers is twice the tear-off and twice the dumpster.
- Same underlayment coverage. Valleys-only vs full-deck coverage is a different roof.
- Same flashing. New vs reused is not a price difference — it is a different job.
Three to four quotes is enough. If you collect six, you will be tired and no wiser. Focus on two that you can normalize to the same scope. If both are reputable and the numbers are close, choose the one that communicates better and commits to a clean schedule. If one is materially lower after scope alignment, ask why in specific terms. There are legitimate reasons — in-house crews rather than subcontractors, better supplier pricing through volume. Ask, and listen to the answer.
Vague Wording Decoder
Vague words are where scope quietly narrows. Here is what the common ones really mean, and what to ask for.
| Vague wording | What it really means | What to ask for |
| “As needed” | No price agreed, no limit set | Per-unit price + not-to-exceed number, in writing |
| “Standard shingles” | No brand, no line, no warranty tier | Manufacturer, product line, color, in writing |
| “Miscellaneous” | Unspecified costs, unspecified amount | Itemized list of what is in the line |
| “Re-cover” / “overlay” | New roof over old roof, not a replacement | Tear-off vs re-cover, stated plainly |
| “Allowance” | Placeholder amount, final price unknown | What the allowance covers, and what happens if it is exceeded |
| “We stand behind our work” | No warranty terms, no years, no writing | Both warranties, in writing, with years and exclusions |
| “Complete roof replacement” | No product, no layers, no flashing detail | The full 12-line checklist, filled in |
The one that catches the most people is “re-cover.” A homeowner in the research got a quote for what they thought was a full replacement, and the quote actually specified installing new material “on” the existing rubber area — a recovery, not a replacement. The word “on” was doing all the work. Read the prepositions. “On” means over the old roof. “Down to the deck” means a tear-off. If the quote does not say which one it is, it has already hidden the biggest variable.
Change Orders: The Decking Script
Decking is the plywood or board sheathing under everything, and it is the single most abused line on a roofing estimate in America. Nobody can see it until the shingles come off, so the estimate has to guess — and the standard way to handle that is a line that says “decking replacement as needed, priced per sheet,” which sounds reasonable and is an open door. Here is how to close it before anybody starts, in the exact words:
- “What is the per-sheet price, in writing, and does it include material and labor or just material?” Get the number before work starts, not on day two.
- “Will you photograph every bad sheet before it comes out, with something in frame for context?” Photos are the proof. Without them, you are paying for sheets you never saw.
- “Give me a not-to-exceed number. If it goes past 10 sheets, you call me before you replace another one.” An honest contractor agrees without blinking, because on most houses it is three or four sheets. The other kind will explain why that is not practical. Listen carefully to that explanation.
- “Will any change order be in writing, with my approval, before the work is done?” A change order is a written amendment: what changed, what it costs, how it affects the schedule, and both signatures. If the crew replaces decking and tells you about it afterwards, that is not a change order — that is a bill.
The reason this matters in San Francisco specifically: fog and the rain season rot decking silently. A roof in the Sunset that has been damp for years can hide far more rot than a roof in the Mission. The per-sheet price and the not-to-exceed number are your protection against the day-two phone call with your house open to the sky.
If the crew finds rot and the quote has no decking line at all, stop and ask. Do not let them keep working on a verbal “we’ll sort it out later.” Later is when you have no leverage.
Payment, Warranties, and the Completion Checklist
Payment: a reasonable quote lays out a staged payment schedule tied to actual project milestones — a deposit at signing, a payment when materials are delivered, and a final payment on completion. Never pay in full before work begins. In California the deposit is capped at 10% or $1,000 (see the California section above). A price that is good “for the season” or “for the next 24 hours” is a sales tactic, not a quote — get the expiry date in writing. Most quotes are good for 15–30 days; after that, material prices move and the quote should be re-issued.
Warranties — two of them, separately, in writing:
- Manufacturer’s warranty covers defects in the materials. Manufacturer material warranties commonly run 20–50 years, depending on the product and the system tier. The tier matters: a system warranty (all components from one manufacturer, installed to their specification) covers more than a shingle-only warranty, and manufacturer certification affects which tier you qualify for.
- Workmanship warranty covers errors in the installation, and it comes from the contractor, not the manufacturer. Get it in writing — what it covers, how long it lasts, and what voids it. Poor attic ventilation and unauthorized repairs are the two commonest void conditions. A verbal promise is not a warranty.
One honest warning from the research: a 50-year warranty sounds nice, but your insurance company may require a roof replacement 20–30 years before that. The warranty and the insurer’s timeline are two different clocks.
The completion checklist — before the final payment, all five:
- Final inspection passed, and the SF permit signed off.
- Magnet sweep done, yard and landscaping protected, AC units covered.
- Lien release in hand — a document that says the contractor and their suppliers have been paid and cannot lien your house.
- Warranty documents received — both warranties, registered, in writing.
- Out-of-scope items named — satellite realignment, interior sheetrock for skylight replacements, and anything else the roofer does not do.
Final payment comes after all five, not before. That is the whole point of a staged schedule.
Insurance Quotes: Xactimate, RCV, and the Deductible Trap
If your roof job is an insurance claim, you are reading two different documents, and most homeowners do not know that. The carrier’s estimate and the contractor’s estimate are not the same thing — and the contractor should line them up item by item before work starts.
The three numbers on an insurance settlement, in plain words:
- RCV — replacement cost value: what it costs to replace the roof at today’s prices.
- Depreciation: what the carrier subtracts for the age of your old roof.
- ACV — actual cash value: RCV minus depreciation. That is the first check.
A worked example from a creator video in the research — labelled as his example, not a San Francisco price: RCV $10,000, depreciation $4,000, ACV $6,000, deductible $1,000, first check $5,000. With a replacement-cost policy, you get the depreciation back after the work is done — $9,000 working dollars in his example.
The trap: a cheaper contractor quote does not save you the deductible. If the carrier’s RCV is $10,000 and your contractor’s contract is $9,500, the carrier only owes $3,500 of depreciation, not $4,000 — because they only pay for what you spend. You are not saving money on the deductible. You are saving the insurance company money.
Supplements: adjusters leave line items off — code upgrades, flashing, the wrong price list. When that happens, the contractor files a supplement. In the video’s example, chimney flashing was $463.18 asked and $300 agreed — and the $163 gap disappeared. The contractor did not ask the homeowner to pay the difference. That is how a supplement is supposed to work.
The fraud line: any offer to “cover,” “waive,” or “eat” your deductible is fraud, and it implicates you as well. It has been illegal for well over a decade. The trick is false documentation — sign a $9,000 deal but document a $10,000 contract to release the full depreciation. One roofer in the research was witnessed making up a $1,000 deductible by installing architectural field shingles with 3-tab shingles at the peaks. If a roofer is willing to lie to the insurance company, ask yourself what stops them from lying to you. The only legal way to cover part of a deductible is to forego work you were paid for — skip the gutters, skip the interior paint — and do it yourself.
Two more insurance warnings from the research:
- A document assigning your insurance benefits to the contractor hands them control of your claim. Do not sign one without understanding it.
- If your contractor’s quote does not match the insurance RCV, you may be unable to retrieve your depreciation in full. Line the two estimates up before work starts, not after.
For the restoration-vs-replacement decision that often sits behind an insurance claim, see the commercial roof restoration vs replacement guide. For how leaks get found before a claim is filed, see the roof leak detection guide.
Red Flags: When to Walk Away
- A one-line quote with no itemization. One estimator in the research put it plainly: it is “extremely lacking and leaves way too many places to cut corners.”
- No license number or insurance information on the document.
- Pressure to sign today, or a price that expires this afternoon.
- Full payment, or a large deposit, before work begins.
- A verbal quote that keeps rising every time the contractor calls.
- Damage found on a roof you did not ask them to inspect, particularly after a door knock.
- A quote that matches the insurance estimate exactly, line for line — ask why, and check the RCV.
- A public adjuster arriving with the roofer, uninvited, offering to get you “the max for my claim for 10%.”
- And the strangest one in the research: the most professional-looking quote can be the worst offer. Polish is not value. A beautiful document with the wrong scope is still the wrong scope.
How to Say No to a Roofer
This is the highest-engagement topic in the entire research — 155 votes, 114 comments — and no competitor guide covers it. Homeowners do not know how to turn a roofer down, so they ghost them, and then they feel guilty about it. Here is the whole technique, in one sentence:
“Sorry, I took another roofing contractor. I no longer need your services.”
That is it. You do not owe a reason, a comparison, or a negotiation. Say it once, by text or email so there is a record, and move on. If the roofer stopped responding to you first, you can say that too — but you do not have to. A short, polite no is a complete answer.
Questions to Ask — Before You Sign, During Tear-Off, At Completion
Before you sign:
- Who is actually on my roof — your own employees, or a subcontractor? Neither answer is wrong, but you should know who is responsible if something goes sideways.
- What does the workmanship warranty cover, and for how long? Get it in writing.
- What happens if you find rotten decking? You want a per-sheet price, photos of every sheet, and a call before the count climbs past what you agreed to.
- How is payment scheduled? Staged, tied to milestones, with the final payment after completion.
- Who pulls the permit, and who schedules the final inspection?
- Did you walk the roof and check the decking, or just measure from the ground? Satellite measurements are accurate for size — they cannot see rot.
- If I am planning solar in the near future, can the mounting feet go on with the new roof?
During tear-off:
- Show me the photos of every bad sheet before you replace it.
- Are we past the not-to-exceed number? If so, stop and call me.
- What is the weather plan if it rains mid-job?
At completion:
- Has the final inspection passed, and is the permit signed off?
- Where is the lien release, and where are the warranty documents?
- Was the magnet sweep done, and is the yard clear?
How We Checked This Guide
This guide was built from seven competitor guides and eight live-ranking pages, compared line by line — New-Gen, Gateway Ontario, Owens Corning, Northwest Roof Maintenance, TallySquare, Spartan Exteriors, GeekMamas, BlogFreely, Alpha Pro NJ, Chantilly, Charlotte, and REMI HQ — plus about 76 user-post titles and five creator video transcripts. The titles and videos were used as demand evidence only: they tell us what homeowners ask, what confuses them, and what frustrates them. They do not set prices, law, or policy.
California law in this guide — the CSLB lookup, the B&P §7159 deposit cap, the 3-day cancellation, the $500 written-contract rule — is stated as California law, not as a competitor’s claim. Where competitors contradict each other on deposits (Ontario 10–30%, one American guide 10–15%), the California figure is given and the others are named as wrong for California. Where competitors publish example prices (national bid totals, per-sheet template figures, cost-split percentages), those figures are not copied as San Francisco prices — this article carries no prices. The Xactimate dollar figures are the video’s own worked example, labelled as such. No location, zip code, or landmark in this guide is presented as the business address — the neighborhoods and zip codes are area examples only. If a figure in this guide changes, it will be because California law or the San Francisco permit process changed, not because a rival site changed its price.
Frequently Asked Questions
Bottom line
Read the scope, not the total. Compare square counts, waste factors, layer counts, decking prices, and the word “new” on the flashing — and do it before you look at the bottom line. In California, check the license at cslb.ca.gov, hold the deposit to 10% or $1,000, and get the per-sheet decking price and the not-to-exceed number in writing before the first shingle comes off. On a San Francisco flat roof, make sure the quote names the system, the prep, the ponding plan, the parapet and the drains — because fog, salt air, and the November-to-March rain do not care what the national guides say.